What are the requirements for permit types?

Residential Building Permit New Construction

  1. One digital (PDF) copy of plans emailed to Community Development or on CD
  2. Completed application
  3. Shrink-swell soil test results
  4. If located in the floodplain, preconstruction Certificate of Elevation
  5. Certified plat showing all easements, existing structures, and proposed structures
  6. Erosion and sediment control permit

Residential Building Permit Existing (Addition / Alteration / Demolition)

  1. One digital (PDF) copy of plans emailed to Community Development or on CD
  2. Completed application
  3. If located in the floodplain, preconstruction Certificate of Elevation
  4. Certified plat showing all easements, existing structures, and proposed structures
  5. Erosion and Sediment Control Permit from the Engineering Department

Commercial Building Permit New Construction

  1. One digital (PDF) copy of sealed (architect or engineer) plans, including all electrical, mechanical, and plumbing drawings emailed to Community Development or on CD
  2. Approved site plan
  3. Shrink-swell soil test results
  4. Completed application
  5. If located in the floodplain, Preconstruction Certificate of Elevation
  6. Erosion and Sediment Control Permit from the Engineering Department

Commercial Building Permit Existing (Addition / Upfit)

  1. One digital (PDF) of sealed (architect or engineer) plans, including all electrical, mechanical, and plumbing drawings emailed to Community Development or on CD
  2. Completed application
  3. Approved site plan (if needed)
  4. Asbestos certification
  5. Accessibility compliance
  6. If located in the floodplain, Preconstruction Certificate of Elevation

Please note: If a preconstruction Certificate of Elevation is required, then before a Certificate of Occupancy is issued, we must receive a post-construction Certificate of Elevation.

Show All Answers

1. When is a permit required?
2. What is a permit required for?
3. What is a permit not required for?
4. What are the requirements for permit types?